CRANE MODIFICATION AND MODERNIZATION
The continuous technological updating and the optimization of the loading and unloading cycles require the modification and modernization of the cranes and their automation components in order to guarantee the efficiency of the machines themselves.
Modernization of the transtainer anti-collision system
Modernization of the Transtainer anti-collision system with programmable zone laser scanners. The system manages the slowdown and stop areas of the Trastainer by interfacing with the automation and handling system.
Replacement and modification of crane overload control cells
Replacement of crane lifting overload cells, including disassembly and modification of the existing system, selection of new load cells, mechanical adaptations and integration of new cells into machine safety.
Modernization, modification and replacement of crane fifth wheels
Modernization, modification and on-site replacement of crane slewing rings, including design, reverse engineering, design construction of slewing rings, securing of the crane, lifting and installing new slewing rings.
Scheduled and emergency crane maintenance in the railway Container Terminal
Scheduled and emergency maintenance of RTG (Rubber Tire Gantry) and crane in railway container terminal.